Business News
Home > News > Business News
Congratulations to James Indusrty Group Co.,Ltd obatin UL approval for LED Tube lamps
On October, 2014, the engineering team of Standard-Tech Finished Products Division helped Bravoled Lighting Manufacturing Co., Ltd. pass UL1993 and UL8750 tests and obtain UL LISTED certificate for LED Tube lamps intended as direct replacements. Now as the first UL accredited compatible LED tube manufacturer in the industry, Bravoled Lighting has taken the lead to open the U.S. market.

As UL’s first PPP lab for LED lighting in Asia, Standard-Tech has mastered the technical requirements of
LED Tube lamps intended as direct replacements. Independently conducting the tests and preparing the report, Standard-Tech Lab has again completed a UL certification project quickly and efficiently.

Bravoled Lighting Manufacturing Co., Ltd. is a manufacturer engaged in the development, design, manufacturing and marketing of LED outdoor lamps and indoor lamps. With a workshop area of 6,000 mm, Bravoled Lighting has been staffed with 150 employees and equipped with advanced production equipment. An independent product developer, Bravoled Lighting has been pursuing product quality and quality services, and committed to continuous progress and innovation since its establishment. Now, Bravoled Lighting has been exporting products to Europe, the U.S., Australian and South Africa.


About UL Listing Mark
This is one of the most common UL Marks. If a product carries this Mark, it means UL found that representative samples of this product met UL’s safety requirements. These requirements are primarily based on UL’s own published Standards for Safety, or other recognized third party standards. The UL Listed Mark includes the UL symbol, the word “Listed,” the product or category name, and a control number assigned by UL.    

About Standard-Tech

Standard-Tech’s UL's First Perferred Partner Lab for Lighting Industry in Asia (UL file no. AG392), and UL's First CAP-EA (TPTDP) lab for Lighting Products in Great China.

Standard-Tech’s engineers have passed UL’s examination and accredited by UL, they can complete construction inspection, conduct tests and prepare report for lighting product in our lab directly. UL review the test data and report from Standard-Tech, and release the product certification and authorization. Standard-Tech can complete the tests within 2 weeks, greatly shorten the lead time and raise the UL certification service’s efficiency and convenience.




 
Partners
NETC GuangzhouHeadquarters
Ms. Susan Xu
18102802071
Tel : 020-32032800 / 32290275
Fax : 020-32290422 / 32290556
Add : 19/F,Block 7,Country Garden Carat Square,No.75 Yaotianhe Street,Guangzhou Science City, Guangzhou 511356,China
NETC NingboLaboratory
Mr. Tom Xiao
18857476827
Tel : 0574-87468902, 87836802
Fax : 0574-87835902
Add : 2nd floor,Block B,Ningbo Testing and Certification Base,No.66 Qingyi Road,Ningbo National Hi-Tech Zone,Ningbo, Zhejiang, China
New East Test & Cert. Group © Copyright Powered By LY-Network 粤ICP备05042123号

粤公网安备 44011602000359号

Standard-Tech QR Code
点击这里给我发消息
Susan (Safety & EE Dept.)
点击这里给我发消息
Fiona(Safety & EE Dept.)
点击这里给我发消息
Lynn(Safety & EE Dept.)
点击这里给我发消息
Lucky (Shenzhen Lab)
点击这里给我发消息
Cici (Ningbo Lab)